home *** CD-ROM | disk | FTP | other *** search
/ MacWorld 1998 October / Macworld (1998-10).dmg / Shareware World / Utilities / Data & Time Management / Midius ProjectPlanner 1.1.1 / ProjectPlanner README 1.1.1 < prev    next >
Text File  |  1998-08-06  |  6KB  |  140 lines

  1. Midius ProjectPlanner 1.1.1
  2.  
  3. Date of Release: 6 August 1998
  4.  
  5. The Midius ProjectPlanner is a Macintosh program for making time schedules (Gantt charts).
  6.  
  7. The Project Planner folder contents:
  8. - ProjectPlanner README 1.1.1      this file
  9. - Midius ProjectPlanner                fat version of the program
  10. - User's manual                             the user's manual in pdf (Acrobat) format
  11. - (HTML)                                        folder that contains small GIF-files (pictures)
  12.                                                      that are necessary to be able to view a Gantt chart
  13.                                                      exported in HTML format.
  14. - Register                                     program for creating register forms to be sent to Kagi 
  15.  
  16. Requirements:
  17. System 7.1 or later
  18. 68020 or better
  19. Colour display is required
  20.  
  21. Registering
  22. To register use the Register program to create a register form which then shall be sent
  23. to Kagi Shareware using mail, email or fax.
  24.  
  25. The price for a single license is 35 USD, there are also site and world licenses available for
  26. 600 USD resp. 2500 USD.
  27.  
  28. http://www.kagi.com
  29. Email: shareware@kagi.com        (1 to 3 day processing time delay)
  30. FAX: +1 510 652 6589            (4 to 8 day processing time delay)
  31. Postal address:                       (4 to 8 day delay plus transit time to Kagi)
  32. Kagi
  33. 1442-A Walnut Street #392-MU
  34. Berkeley, California, 94709-1405
  35. USA
  36.  
  37. Please note that Kagi automatically rejects any electronic payment that come includes
  38. a hotmail.com address. Refer to http://www.kagi.com/FAQs/hotmail.com
  39.  
  40. N.B. Kagi is a payment processing company and they are not the author/shipper of the
  41. product. Any problems with receiving registration codes or any problems with the product itself shall be addressed to the author at m-arc@algonet.se or micke@kagi.com
  42.  
  43. Registration codes will be sent to you normally within a week after receive a
  44. confirmation of your order from Kagi.
  45.  
  46.  
  47. Disclaimer
  48. This software is provided "as-is". I take no responsiblity in any damage caused by the
  49. software, use of the software or any of its outputs. Use it at your own risk.
  50.  
  51.  
  52. Changes in 1.1.1 (6 August 1998)
  53. • Corrected some crash bugs related to the date fields.
  54. • Corrected a bug that got ProjectPlanner into an endless loop if entering a
  55.    duration of 0 days.
  56.  
  57.  
  58. Known Bugs
  59.  
  60. • When printing a time chart with a activity table spanning over two pages, horizontally,
  61.    the output is not as beatiful as it should be...
  62. • You cannot make schedules with starting dates prior to 1986.
  63. • Having a schedule spanning over a long period and displaying it with a high
  64.    "resolution" (e.g. timescale=days) will cut off some parts of the time schedule.
  65. • When entering the year with only two digits, e.g. 14/12/97 the MacOS rules
  66.    is used to determine the century:
  67.      If the value of the input year is less than 100, StringToDate determines the year as follows.
  68.       1. If (current year) MOD 100 is greater than or equal to 90 and the input year is less than
  69.       or equal to 10, the input year is assumed to be in the next century.
  70.       2. If (current year) MOD 100 is less than or equal to 10 and the input year is greater than
  71.       or equal to 90, the input year is assumed to be in the previous century.
  72.       3. Otherwise, the input year is assumed to be in the current century.
  73.       If the value of the input year is between 100 and 1000, then 1000 is added to it. Thus the
  74.       dates 1/9/87, 1/9/987, and 1/9/1987 are equivalent.
  75.  
  76. Use the web-page http://www.softsys.se/ProjectPlanner/ to get new releases etc. 
  77.  
  78. Questions concerning the program can be sent directly to the author at m-arc@algonet.se or
  79. micke@kagi.com
  80.  
  81.  
  82. This program should only travel in the complete folder.
  83.  
  84. Have fun,
  85.  
  86.                 Mikael Arctaedius
  87.         Stockholm, Sweden
  88.  
  89.         email: m-arc@algonet.se
  90.         http://www.softsys.se/ProjectPlanner/
  91.  
  92.  
  93.  
  94. Release History
  95.  
  96. Changes in 1.1 (3 August 1998)
  97. • Corrected some crash bugs related to selecting/deselecting the activity field.
  98. • The Enter key (beside the numerical keypad) is now treated like the return key.
  99. • When the "Completed" tool is selected the completed percentage value is displayed
  100.    in the lower left corner.
  101. • The delete key can now be used instead of the Edit->Clear menu commmand to delete
  102.    a chart element.
  103. • Corrected the behaviour of some OK buttons in dialogs.
  104. • Corrected the saving of Page Setup settings.
  105. • Corrected a bug that made ProjectPlanner freeze in a never-ending loop when
  106.    changing size of a column under certain conditions.
  107. • Made it compatible with CustomMenus.
  108. • Added an "Import data" feature.
  109. • Modified the "Export data..." dialog so that it is possible to choose between exporting
  110.    all columns or only visible columns.
  111. • Removed "Not registered" text on printouts.
  112. • Added auto-completion of the responsible text field.
  113. • Shift TAB can now be used to move backwards through the cells in the table.
  114. • Added a new preference option: "auto-optimize activities". If it is enabled, all
  115.    linked activities will always be adjusted to produce the shortest possible duration.
  116. • Better screen update of dependency links.
  117. • Added simple HTML output.
  118. • Corrected some problems with computation of work and stopdate when the duration
  119.    was changed.
  120. • Changed to a newer version of the Mercutio API. The previous version did cause quite
  121.    a few repeatable crashes which now are gone.
  122. • The date in the lower left corner is now updated also when you move or change
  123.    duration of an activity. In the case of mving an activity, the new start date is
  124.    displayed, and in the case of changing the duration the new stop date is displayed.
  125. • Added support for Navigation Services (PowerPC only).
  126. • And much more...
  127.  
  128. Changes in 1.0 (4 May 1998)
  129. • The last of activity rows in a summary can be reverted back to a non-summary row
  130.    by positioning the textcursor at the Activity's first character position and then
  131.    using the backspace key.
  132. • Entering 0 in the Work column will remove the time-bar in the activity-diagram
  133. • Made ProjectPlanner Y2K-ready.
  134. • And much more...
  135.  
  136. Changes in 1.0b6 (8 April 1998)
  137. • Changed the implementation of selection of activity rows. Now it is more in line
  138.    with Apple's Human Interface Guidelines (HIG).
  139. • And much more...
  140.